Calorifier Heat Exchanger Repair

Calorifiers needs regular maintenance to ensure optimum performance. Planned maintenance is essential, and should be carried out at six-month intervals, even if the calorifier appears to be functioning normally.

Speak with our experts

Fill out our quick and easy contact form with your enquiry and we'll get back to you.

    Need to attach a file to your enquiry?

    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

    Calorifier Maintenance

    Without regular planned maintenance, a calorifier’s efficiency may reduce over time. This may be for any number of reasons including leaking tubes, passing of the primary fluid across the header division web or a build-up of scale on the heat transfer surfaces. Early detection is needed in order to avoid extended downtime and excessive remedial costs. This is particularly important for public buildings, as water temperatures for HW services of less than 60oC for extended periods could lead to the growth of Legionella bacteria.

    A typical planned maintenance inspection would first involve a visual check to spot any obvious problems, however, most calorifier problems will be found internally. The most reliable method for proving the integrity of a calorifier tube bundle is to remove it from the calorifier shell and carry out a hydraulic pressure test to the recommended pressure. The header should also be inspected for pitting and corrosion of sealing faces and erosion of the inner surface.

    A common issue with tube bundles is thinning of the tube walls, particularly at the inlet and outlet where they are expanded into the tube sheet. If the tubes start to leak, the calorifier should be isolated until repairs can be carried out.

    Heatxforce are able to manufacture replacement tube bundles or carry out repairs to existing bundles depending on the condition of the tubes and tube sheet. The tube sheets are usually manufactured from rolled Naval Brass plate and Copper “U” formed tubes with plain or extended surfaces. Where only the ends of the tubes have suffered a reduction in wall thickness, it is often possible to “crop” the tubes. This involves cutting the tubes close to the back of the tube sheet, thus removing the affected parts of the tubes. The cropped tubes can now be refitted, and although this will slightly reduce the tube length, it is unlikely to have a significant effect on thermal performance but will be far less costly than full tube replacement.

    The shell side inspection, though mainly visual, will include a measurement of the wall thickness, as this is safety critical. In the case of unlined steel shells, there is generally, corrosion of the inner surface over time. Steel shells are designed to include a corrosion allowance, however, once the minimum wall thickness is exceeded, the shell must be replaced. It is good practice to remove any accumulation of loose debris from the shell whilst the tube bundle is removed.

    Calorifier

    For more information,

    Access our
    free brochure

    Hot Water Packages & SKID Fabrication

    Calorifier & Coils Build & Repair

    Heatxforce build pressure equipment in accordance with PD5500 and ASME VIII Pressure vessel codes whilst conforming to the European Pressure Equipment Directive (PED) and UKCA Pressure Equipment Safety Regulations (PESR), which are mandatory inspection requirements applicable to pressure vessels and systems.

    Our welding procedures are in accordance with ISO 15614-1 and ASME IX.

    Welder qualifications are in accordance with ISO 9606-1 and ASME IX.

    All of our welding related qualifications are certified by TUV Nord.